BISHKEK, Kyrgyzstan, Would possibly 16. Plans are underway
in Kyrgyzstan to put together 15 to twenty kilometers of Balykchy –
Kochkor railway in 2024, Development studies.
Kyrgyz Railways, which implements the venture, is making ready the
base railway development within the Orto-Tokoy reservoir. Geogrids
and large-diameter pipes also are being put in. Building
comes to over 30 specialised items of apparatus and more or less 60
personnel.
On March 31, 2022, President of Kyrgyzstan Sadyr Zhaparov
introduced the development works for the Balykchy-Kochkor railway.
The development of this railway branch is simply the primary degree of
enforcing the bigger venture Balykchy — Kochkor — Kara-Keche
with a dimension of 186 kilometers.
The Balykchy-Kochkor-Kara-Kechu railway is meant to fix
town of Balykchy, the village of Kochkor, and the Kara-Kechu
coal vault throughout the territories of Issyk-Kul and Naryn areas
of Kyrgyzstan.
Moreover, it goals to hyperlink up with the deliberate China –
Kyrgyzstan – Uzbekistan railway, thus making a unified railway
community throughout the nation.
To notice, the China-Kyrgyzstan-Uzbekistan railway, a deliberate
454-kilometer rail sequence, is meant to fix China’s and
Uzbekistan’s railways via Kyrgyzstan’s dimension and additional
hyperlink up with the Eu railway community via Turkmenistan,
Iran, and Türkiye.