There’s a plan to provide as a lot as 1000kg of hydrogen a day at a selected manufacturing hub within the ACT. The situation of this hub continues to be undecided nevertheless it might want to have premium and straightforward transport entry, in addition to a locale the place PE doubtlessly can entry a “behind the meter” renewable energy provide, on condition that producing hydrogen is a vastly electrical energy intensive course of.