BAKU, Azerbaijan, June 3. The scheduled pace
for the graduation of business operations of the IP Komotini
DESFA-ICGB is ready for July 1, 2024, Development reviews on the subject of the ICGB,
operator of the Interconnector Greece-Bulgaria (IGB).
In this pace ICGB might grant transportation products and services to the IGB
Community Customers.
“The graduation of business operations could be matter to a
extend because of an tournament or environment (or a mixture of occasions
and/or instances) past the cheap keep watch over of ICGB,” stated
the corporate.
The IGB fuel pipeline interacts with the Greek nationwide fuel
transmission gadget (DESFA S.A.) and the Trans-Adriatic fuel
pipeline (TAP AG) within the department of Komotini (Greece), and with the
Bulgarian fuel transmission gadget (Bulgartransgaz EAD) within the department
of Stara Zagora.
The full space of the fuel pipeline is 182 km, the diameter of
the pipe – 32” – and a design capability of as much as 3 billion cubic
meters according to future within the route Greece – Bulgaria.
Relying available on the market hobby for higher capability and the
probabilities of the neighboring fuel transmission methods, the
capability of IGB is designed with the choice for build up as much as 5
billion cubic meters according to future with alternative building of a
compressor station.
Practice the writer on X: @Lyaman_Zeyn