Article content material
The Town of Toronto says signage for Yonge-Dundas Sq. used to be decommissioned previous this week and signage reflecting the web page’s brandnew title is anticipated to be put in via the tip of the month.
Article content material
An replace at the renaming and rebranding of the downtown landmark is specified by a report i’m ready to be offered to town council at its assembly on Wednesday.
Article content material
The report, signed via town supervisor Paul Johnson, says the Yonge-Dundas Sq. Board licensed a reputation trade to Sankofa Sq. at a February assembly and brandnew signage might be a part of the rebranding.
Advisable from Editorial
‘IT’S SANKOFA SQUARE, PERIOD:’ Renaming leaves thousands and thousands on desk
‘NOT ABOUT VALUE’: Sankofa rename would price up to Bayview Ave. revamp
It says a supplier might be decided on to put together the brandnew signage, with the design, fabrication and set up anticipated to price between $105,000 and $200,000.
Alternative prices related to the renaming — together with branding, programming and variety, fairness and inclusion tasks — are estimated to be between $300,000 and $600,000.
The report says any prices past the $335,000 incorporated within the 2024 funds might be coated via the sq. thru third-party monetary companions and in-kind assistance.
The trade is a part of an ongoing struggle via town to rename family property bearing the title of Henry Dundas, a Scottish baby-kisser who not on time the abolition of slavery in Britain via 15 years.
RECOMMENDED VIDEO
Proportion this text on your social community