Article content material
Listed here are some hassle spots in and round Montreal to keep away from this weekend.
Freeway 25
Article content material
The Louis-Hippolyte-La Fontaine Tunnel will probably be closed overnights this weekend in each instructions, between Souligny Ave. and Route 132, from 11 p.m. Friday to eight a.m. Saturday, 11 p.m. Saturday to 9 a.m. Sunday, and 10 p.m. Sunday to five a.m. Monday. Freeway entrances will shut half-hour earlier than the freeway does, as will Souligny Ave. eastbound over the freeway. Souligny westbound may also be closed between 10:30 p.m. Friday and eight a.m. Saturday from Honoré-Beaugrand St. to Dickson St. In a single day closures will proceed by means of April 22, between Route 132 and Sherbrooke St. On weeknights the closures will run from 9 p.m. to five a.m.
Article content material
Freeway 19
The Papineau-Leblanc Bridge connecting Montreal and Laval will probably be closed all weekend, from 10 p.m. Friday to 4:30 a.m. Monday. Northbound, it will likely be closed between Henri-Bourassa Blvd. and de la Concorde Blvd. Southbound, the freeway will shut from Freeway 440 to Henri-Bourassa Blvd., although the service highway will stay open to St-Martin Blvd.
Route 136
Exit 6 (St-Laurent Blvd. and Berri St.) of the eastbound Ville-Marie Expressway will probably be closed from 10 p.m. Friday to five a.m. Monday for work by the town of Montreal on the Place des Montréalaises.
Sherbrooke St.
In Notre-Dame-de-Grâce, the road will probably be down to at least one lane eastbound and two lanes westbound between Prud’homme Ave. and Décarie Blvd., between 7 a.m. Saturday and three p.m. Monday, for work on a water fundamental.
Réseau categorical métropolitain
Service on the REM will begin at 7:30 a.m. on Saturday to permit for a techniques replace. Shuttle buses will probably be accessible between 5:30 and seven:30.
Ongoing disruptions
Freeway 20: The exit for Sources Blvd. northbound from Freeway 20 east stays closed till Might 4.Freeway 520: The freeway is closed in each instructions at Hickmore St., with visitors detoured by way of the service roads.
Upcoming
The Quebec transport ministry additionally introduced this week that the spring thaw interval, throughout which there are restrictions on heavy hundreds, has been moved up in southern Quebec and begins at 11:59 p.m. Friday.
Really helpful from Editorial
Bridge work round Montreal will span the summer time
Montreal to seek the advice of on plan to construct highway by means of Boisé Steinberg
Share this text in your social community